案例研究

Turning the tide on energy

The €20 million flagship Enabling Future Arrays in 潮汐 (EnFAIT) project, led by Nova创新 in collaboration with eight other organisations

  • linkedin图标
  • twitter图标
  • facebook的图标
  • youtube图标
  • instagram图标
项目详细信息
项目名称:
EnFAIT 潮汐 Array
客户名称:
Nova创新
地点:
苏格兰
Andy MacGillivray
首席工程师  
关键的事实
潮汐 energy project:
潮汐 energy arrays can be significantly increased and that the cost of tidal energy can be reduced by at least 40%
类型 of project:
离岸数组
Project completion:
正在进行的

The €20 million flagship Enabling Future Arrays in 潮汐 (EnFAIT) project, led by Nova创新 in collaboration with eight other organisations, 包括木, has received approval from the European Commission to proceed to its next stage after a successful first full year.

The world’s first grid-connected offshore array of tidal energy turbines is located in Bluemull Sound off the Shetland Islands in 苏格兰. As the independent technical and commercial expert on the project, Wood’s clean energy team commissioned to verify each stage of the development process from project engineering design to operation in the tidal stream environment.

The European Union-backed tidal energy project aims to prove that the reliability and availability of tidal energy arrays can be significantly increased and that the cost of tidal energy can be reduced by at least 40%. 潮汐 energy has the potential to diversify the global energy mix even further and places the UK and Shetland right on the front line of this industry that is advancing the energy transition.

The European Commission’s approval for the project to progress to its next stages follows a review by three independent technical experts to confirm that the project has progressed as planned and put in place the key ingredients for success. Over the next four years, the EnFAIT project will extend the Bluemull Sound array to six turbines and demonstrate that high array reliability and availability can be achieved using best practice maintenance regimes. The layout of the turbines will be adjusted to enable array interactions and optimisation to be studied for the very first time at an operational tidal energy site.

Over the next stages of the project, Wood will be responsible for verifying the commissioning and operational performance of the turbine array installed at the site. We will also be responsible for verifying that the decommissioning of the turbines is carried out safely, as well as capturing and disseminating lessons learnt for the benefit of the wider industry.